Sorry for the delay. All the doors and frames have been painted, benches and basic plumbing has been done, the bath tub has been installed and the fences have been started. Also the garage floor has been concreted.
On 03/09/2016
The Ceilings were patched up today and the cornice was started. All the windows and and glass sliding doors were installed on Friday, 02/09/2016.