Flooring has been installed by Trevor’s Carpets throughout the house. All external painting and touch-ups finished and the kitchen appliances have been installed. All that’s left is some brick paving and the garage door to be fitted!
Sorry for the delay. All the doors and frames have been painted, benches and basic plumbing has been done, the bath tub has been installed and the fences have been started. Also the garage floor has been concreted.