20160614_165259

Site power got installed on the 14th of June. All the last of the storm water pipes were installed and buried.

20160609_165751

The wife was a little annoyed the pad got ‘dirtied’ when the piping was installed.

20160618_120920

We went past the block today (Saturday, 18th of June) and saw someone ruling up lines on the pad. We spoke to the man who turns out to be one of the brickies who will be starting the walls on Wednesday (22nd of June). He also said the bricks and frames should be turning up on Tuesday (21st of June).

20160618_121301